skip the i-GuideIllinois State UniversityAdmissions at ISUAcademics at ISUEvents at ISUMap of ISUISU A to Z ListingISU AccessibilityISU 150th Anniversary
Environmental Health and Safety

For more information

Back to main ACM Locations

Asbestos Containing Material
Atkin Residence Hall BLD #310 and
Atkin - Colby Connect BLD #312  

ACM
Quantity
Location
TJA - Mudded Joints on F/G Pipe Cover
ME Room,Pipe Chases, ceilings and penthouse.
TJB - Mudded Joints on Magnesium Pipe Cover
ME Room,Pipe Chases, ceilings and penthouse.
TPA - Magnesium Pipe Cover
ME Room,Pipe Chases, ceilings and penthouse.
MFA - 9 X 9 Floor Tile and Mastic (Assumed)
71,100 SF
Throughout student rooms, landings and hallways.
MFA - 9 X 9 Floor Tile and Mastic (Assumed)
18,800 SF
Throughout informal connecting lounges
MFB - 12 x 12 Floor tile and mastic (Assumed)
80 SF
Basement Break Room
MMA - Carpet Mastic (Assumed)
 
MTA - Transite Panels (Assumed)
Through out student room behind ventilators
SCA  - Spray on Acoustic Ceilings
20,000 SF
Basement Rec space and ceilings of connecting lounge
SFA – Spray on Fireproofing
90 SF
Basement ME Room 13
     
ABATEMENT HISTORY
DATE
MATERIAL REMOVED
AMOUNT
ROOM OR LOCATION
 
12/91
TJA,TJB AND TPA
ABATEMENT
ACCESSIBLE PIPE CHASES
06/95
TJA
ABATEMENT
ACCESSIBLE HOT AND COLD WATER LINES
12/95
MFA and mastic
Room 1070 and 7072
7/01
SCA, TJA,TJB and TPA
ABATEMENT
Incinerator Room
6/03
TJA,TJB and TPA
100 LF
Accessible areas Above Apartment Ceilings
3/06
SCA
30 SF
9th Floor Loung Ceiling NW Corner