ACM |
QUANTITY |
LOCATION |
|
| SCA – Textured Spray on Acoustic Ceilings | 4,183 SF |
Hallway 135, Foyer 136, Hallway 139 & First Floor Rooms and spaces; 110, 112, 114, 116, 118, 120,121,122,123,124,125,126,127,128,131,131B,131C,131D,131E. Spaces; Rooms 323 & 423. |
|
| SCB – Smooth Spray on Acoustic Ceilings | 4,438 SF |
Second Floor Spaces: Foyer 240, Foyer 241, Hallway 243, Hallway 249. Third Floor Spaces; Hallway 339, Foyer 340, Hallway 341, Hallway 345, Foyer 347. Fourth Floor Spaces; Hallway and Foyers 437,439,440,440A,440B, 441,445,446 & 447. Storage Rooms 440C,440D, |
|
| TJS – Mudded joints on F/G Pipe Cover | Laundry Room 144, ME Room 142 and tunnels, Under Stairwell 134, Shop Room 104, Storage room 102, Hallway 101, Room 120, Room 140, Ceiling Spaces of Rooms; 107,110, 212, 312,412. Tub Chases in BSW Rooms; 245,342 and 443. |
||
| TPA – Mag Block Pipe Cover | See Space List Above. |
||
| MFA- 9 x 9 Floor tile and mastic | Through our student rooms and 2nd, 3rd, 4th floor hallways, Stairwell Landings. |
||
| MFB- 12 X 12 Floor Tile and mastic | 1,960 SF |
1st Floor Hallway, Top of Stairwell landings & Shower Foyers, |
|
| MMF – Carpet Mastic | 3,139 SF |
Office Spaces, Shop Room 104, Lounge Room 240,Rooms; 131, 131D, 131E, 240, 243, 249, 339,341,345,441,445.. |
|
| MMG – Vinyl Cove Base | Offices and Hallways |
||
| MTA- Transite Panels | Behind heating units in Rooms 118, 128, 110, 231 ,229, 102, 122, 126, 120, 103, 127, 225, 124,116,125,114,121,123,112, & 227. |
||
| MTB – Transite Peg Board | Maintenance Shop |
||
ABATEMENT HISTORY |
|||
DATE |
MATERIAL REMOVED |
AMOUNT |
ROOM OR LOCATION |
7/93 |
TJS |
ABATEMENT |
LAUNDRY ROOMS, SMALL AND LARGE SHOWER ROOMS 1st - 4th Floors |
4/97 |
TJS |
ABATEMENT |
PIPE CHASES ON FLOORS 2 THRU 4 |
| This building has been decommissioned, asbestos materials abated and scheduled for demolition in September 2008. | |||