ACM |
Quantity |
Location |
|
|---|---|---|---|
| SPF – Texture on Plaster Ceilings | Rooms 183,223,229 and 235 |
||
| TTA – Tank insulation | Basement |
||
| TTB – Hot water Tank Insulation | First Floor |
||
| TTC- Kitchen Hot Water Tank Insulation | |||
| TJC – Mudded joints on Orange TPA Lines | ME Rooms and Pipe Chases |
||
| TPC – Mag Block Pipe Insulation | Room 154 |
||
| TGA – Gasket Material | ME Rooms |
||
| MFA – 12 x 12 Floor Tile and Mastic | 1,802 SF |
Rooms; 195,195A,195B,195C,195D,185D, 185E,144B,147A,147,146H,132,208A & 223 |
|
| MMB – Mastic Under MFB 12 X 12 Floor tile | 19,030 SF |
Rooms; 183,195,208,215D,224A |
|
| MME- Tar Coating on Duct Work | |||
| MMG- Fire Curtain on Stage | |||
| MLA – Paper Backing on Lights | |||
| MTA - Transite | Rooms; 227 & 227D in Ovens | ||
ABATEMENT HISTORY |
|||
DATE |
MATERIAL REMOVED |
AMOUNT |
ROOM OR LOCATION |
3/92 |
MFA and mastic, SPF |
ABATEMENT |
Old Main Room |
1/97 |
TPC |
ABATEMENT |
Upper ME Room Steam to Steam Converter |
3/04 |
TTA and TPC |
220 SF and 10 LF |
Second Level ME Room Tank and pipe cover |
04/00 |
TTB |
ABATEMENT |
Upper ME Room Hot Water Tank Insulation |
5/03 |
TPC |
40 LF |
Center Tunnel |
7/06 |
MFA and Mastic |
350 SF |
Rooms 208 and 208A |