ACM |
Quantity |
Location |
|
|---|---|---|---|
| TJA – Mudded Fittings on F/G Lines | |||
| TJB – Mudded Fittings on Foam Lines | |||
| TJC- Mudded Fittings on Tar Paper Lines | |||
| TTA – Heat Exchanger Insulation | |||
| TPA – Mag Block Pipe Cover | |||
| TPA – Layered Paper Pipe Cover | |||
| TPC – Tar Paper Pipe Cover | |||
| MFB – 9 x 9 Floor tile and mastic | |||
| MLA – Paper Backing on Lights | |||
| Z – Terrazo Not Sampled | |||
ABATEMENT HISTORY |
|||
DATE |
MATERIAL REMOVED |
AMOUNT |
ROOM OR LOCATION |
08/01 |
TJA,TJB,TJC,TTA,TPA and TPC |
ABATEMENT |
Fan Room Behind Stage |
12/01 |
MFB and Mastic |
ABATEMENT |
Rooms 123,125,128,130 and 133 |
03/04 |
MFB and Mastic |
2200 SF |
Basement |
12/05 |
MFB and Mastic |
1041 SF |
Office Suite 230 |
04/06 |
TJA |
20 LF |
Costume Shop Room 20A on domestic water and recirc lines |