Colby Residence Hall BLD #311

ACM
Quantity
Location
TJA - Mudded Joints on F/G Pipe Cover
ME Rooms,Pipe Chases, ceilings and penthouse.
TJB - Mudded Joints on Magnesium Pipe Cover
ME Rooms,Pipe Chases, ceilings and penthouse.
TPA - Magnesium Pipe Cover
ME Rooms,Pipe Chases, ceilings and penthouse.
MFA - 9 X 9 Floor Tile and Mastic (Assumed)
71,100 SF
Throughout student rooms, landings, and hallways
MFB - 12 x 12 Floor tile and mastic (Assumed)
80 SF
Basement Break Room
MMA - Carpet Mastic (Assumed)
 
MTA - Transite Panels (Assumed)
 
SCA  - Spray on Acoustic Ceilings
20,000 SF
Basement rec space and ceilings of Connecting Lounges
SFA – Spray on Fireproofing
90 SF
Ceiling in Basement ME Room 14
 
ABATEMENT HISTORY
 
DATE
MATERIAL REMOVED
AMOUNT
ROOM OR LOCATION
12/91
TJA,TJB AND TPA
ABATEMENT
ACCESSIBLE PIPE CHASES
06/95
TJA
ABATEMENT
THROUGHOUT IN ACCESSIBLE LOCATIONS ON DOMESTIC WATER
07/01
SFA, TJA, TJB and TPA
ABATEMENT
INCINERATOR ROOM
06/03
TJA
100 LF
ABOVE APARTMENT CEILINGS ON DOMESTIC WATER
12/04
MFA and Mastic
1361 SF