ACM |
Quantity |
Location |
|
|---|---|---|---|
| TJB – Mudded Joints on F/G Insulation | |||
| TTB – Hot water tank and exchanger insulation | |||
| TPD – Layered Paper Pipe Cover | |||
| TDB – Duct Insulation | Air Cell on AHU in Room 157 |
||
| TDC – Rope Insulation | Duct Floor Penetrations |
||
| MFC – 9 x 9 Floor Tile and mastic | |||
| MFD – 12 X 12 Floor Tile and mastic | |||
| MLB – Linoleum | |||
| MLC – Paper Backing on Lights | |||
| MTB – Transite | In Fume Hoods |
||
| MTC – Transite Sheeting | |||
| MTD – Transite Tables | Greenhouse |
||
| SCA – Spray on Acoustical Plaster | ME Room 157 |
||
| T – Ceramic Tile Has Not Been Sampled | |||
| Z – Terrazo has not been sampled | |||
ABATEMENT HISTORY |
|||
DATE |
MATERIAL REMOVED |
AMOUNT |
ROOM OR LOCTION |
06/93 |
TJB and TPD |
ABATEMENT |
GREENHOUSE AND VAULT |
12/97 |
MFC and Mastic |
ABATEMENT |
ROOM 220 AND 222A |
06/00 |
SCA,TJB,TPD |
ABATEMENT |
INCINERATOR ROOM 157A |
11/00 |
MFC and Mastic |
ABATEMENT |
ROOM 228 |
06/01 |
MFC and Mastic |
ABATEMENT |
ROOM 233 |
07/04 |
TJB and TPD |
955 LF |
LOWER ME and CLASSROOMS |
07/04 |
SCA |
1975 SF |
UPPER ME ROOM 157 CEILING |
06/05 |
TJB and TPD |
55 LF |
THIRD FLOOR HALLWAY CEILING |
06/05 |
TJB and TPD |
31 LF` |
SECOND FLOOR HALLWAY CEILING |
07/05 |
TJB and TPD |
18 LF |
THIRD FLOOR HALLWAY CEILING |
6/2/06 |
MFC and Mastic |
1192 SF |
Room 336 Computer Lab |
05/06 |
MFD and Mastic |
1100 SF |
CLASSROOM 330 |
05/06 |
MFD and Mastic |
1100 SF |
CLASSROOM 222 |