ACM |
Quantity |
Location |
|
|---|---|---|---|
| SCA - Spray on Acoustical Plaster | |||
| TJA - Mudded Joints on Layered Paper Lines | ME Spaces, Tunnels, Ceilings and Chases | ||
| TJB – Mudded Joints on F/G Lines | |||
| TPA – Layered Paper Pipe Cover | ME Spaces, Tunnels, Ceilings and Chases. | ||
| TTA – Tank Insulation | |||
| MFA – 9 x 9 Floor Tile and mastic | 72,000 SF |
Through Rooms and Hallways | |
| MFB – 12 x 12 Floor Tile and mastic | 3,000 SF |
Basement Break Rooms and Storage | |
| MMA – Carpet | |||
| MMB – Built Up Roof | |||
ABATEMENT HISTORY |
|||
DATE |
MATERIAL REMOVED |
AMOUNT |
ROOM OR LOCATION |
12/02 |
Pipe and Fitting Cover |
Abated |
Basement Laundry |
12/02 |
Fire Proofing and Pipe Cover |
Abated |
Incinerator Room |
07/05 |
MFA, MFB and Mastic |
75,000 SF |
Through out 2nd thru 12th Floors |
07/05 |
TJA,TJB,TPA |
3,000 LF |
Basement, throughout 2nd thru 12th Floors |
02/06 |
TJB |
10 LF |
12th Floor Computer Lab, SW Wall |
02/06 |
TJB and TJA |
90 LF |
South Exterior Walls of 2,4,5,6,7,8 and 9th Floors |
02/06 |
TJB and TJA |
60 LF |
South Exterior Wall Riser on 3,4,5,6,9,10 and 11th Floors |
02/06 |
TJB and TJA |
100 LF |
Off Drain Lines in First Floor Vestibules |
| A major abatement in May of 05, most of the ACM was removed from the building, however, pipe cover still remains in the north wall pipe chases, south wall pipe chases and exterior wall pipe chase in student rooms. | |||