ACM |
Quantity |
Location |
|
| SFA – Spray on Fireproofing | 803 SF | Rooms 008 and 009 | |
| TJA – Mudded Joints on F/G Pipe Cover | |||
| TPA – Layered Paper Pipe Cover | |||
| TTA – Converter Tank Insulation | |||
| MFA – 9 x 9 Floor Tile and mastic | |||
| MCA – 2 x 4 Fissured Ceiling Tile | 204 SF | Room 004 | |
| MLA – Linoleum | 382 Sf | Rooms: 112A, 112B, 113, 127B, 127C, 127D, 701B, 1813D and 1813G | |
| T – Ceramic Tile Not Sampled | |||
| Z – Terrazo Not Sampled | |||
ABATEMENT HISTORY |
|||
DATE |
MATERIAL REMOVED |
AMOUNT |
ROOM OR LOCATION |
7/93 |
MFA and Mastic |
LMTD Abatement |
Rooms 236,244,248,343,345,347,437,441,444,445,548,551,541,543,645,646,635,754, 755,740,743,733,744,852,854,856,836,857,947,954,1036,1041,1042,1034,1035. |
7/93 |
MFA and Mastic |
LMTD Abatement |
Rooms 1135,1142,1147,1148,1150,1149,1153,1154,1240,1241, 1245,1254, 1231,1234,1341,1335,1356,1431,1447,1440,1544,1553,1552,1547,1654. |
08/93 |
TJA, AND TPA |
ABATED |
ACCESSIBLE PIPE CHASES 2nd THRU 17th FLOORS |
10/00 |
TJA,TPA,TTA |
ABATED |
BASEMENT ME ROOM |
| A major abatement completed in July of 07, all accessible asbestos contraining materials were removed. Non-ACM products speced for putback. | |||