Environmental Health and Safety

For more information

Main ACM Locations

Asbestos Containing Material
Hovey Hall BLD #019

 
ACM
Quantity
Location
TJA – Mudded Joints    
TTA – Circulating Tank Insualtion    
TPA – Mag Block Pipe Cover    
TPB – Layered Paper Pipe Cover    
TDA – Duct Insulation    
TDB – Insulation   Floor Heater Units
TDC – Paper Insulation   Behind Doors on Duct Work
MFA – 9 x 9 Floor Tile and Mastic   1st, 2nd, 3rd floor under carpeting in Old HOV and stair landings in HOV Annex
MFB – 12 x 12 Floor Tile and Mastic    
MLA – Paper Backing   On Lights
SFA – Spray on Fireproofing   Ceilings of East Annex ME Room
T – Ceramic Tile Not Sampled    
Z – Terrazo Not Sampled    
     
ABATEMENT HISTORY
 
DATE
MATERIAL REMOVED
AMOUNT
ROOM OR LOCATION
10/88
MFA and Mastic
Abated
Rooms;419,421 and 427
03/93
MFA, Mastic and Transite Ceiling Tile
Abated
Rooms; 207,208,211B,211C,211D,211P,208E,208F and 208C
12/94
MFA and Mastic
Abated
Rooms; 414,415,416,416A,417,417A and 418A
02/95
MFA, Mastic and TSI
Abated
Room 117A
07/95
MFA and Mastic
Abated
Rooms; 410,410A,410B,410C,411,411A AND 411B
07/96
MFA and Mastic
Abated
Hallway 320
10/01
TDA,TJA,TTA,TPA,TPB,TDB,TDC
Abated
ME Room Old Hovey
10/02
SFA
160 SF
ME Room of East Annex
07/03
SFA,TPA,TJA,TPB,TDC
168 SF and LTD ABATEMENT
Telecom Room 5 in East Annex ME Room
05/06
MFA
First floor hallway of old HOV