ACM |
Quantity |
Location |
|
|---|---|---|---|
| TJA – Mudded Joints | |||
| TTA – Circulating Tank Insualtion | |||
| TPA – Mag Block Pipe Cover | |||
| TPB – Layered Paper Pipe Cover | |||
| TDA – Duct Insulation | |||
| TDB – Insulation | Floor Heater Units | ||
| TDC – Paper Insulation | Behind Doors on Duct Work | ||
| MFA – 9 x 9 Floor Tile and Mastic | 1st, 2nd, 3rd floor under carpeting in Old HOV and stair landings in HOV Annex | ||
| MFB – 12 x 12 Floor Tile and Mastic | |||
| MLA – Paper Backing | On Lights | ||
| SFA – Spray on Fireproofing | Ceilings of East Annex ME Room | ||
| T – Ceramic Tile Not Sampled | |||
| Z – Terrazo Not Sampled | |||
ABATEMENT HISTORY |
|||
DATE |
MATERIAL REMOVED |
AMOUNT |
ROOM OR LOCATION |
10/88 |
MFA and Mastic |
Abated |
Rooms;419,421 and 427 |
03/93 |
MFA, Mastic and Transite Ceiling Tile |
Abated |
Rooms; 207,208,211B,211C,211D,211P,208E,208F and 208C |
12/94 |
MFA and Mastic |
Abated |
Rooms; 414,415,416,416A,417,417A and 418A |
02/95 |
MFA, Mastic and TSI |
Abated |
Room 117A |
07/95 |
MFA and Mastic |
Abated |
Rooms; 410,410A,410B,410C,411,411A AND 411B |
07/96 |
MFA and Mastic |
Abated |
Hallway 320 |
10/01 |
TDA,TJA,TTA,TPA,TPB,TDB,TDC |
Abated |
ME Room Old Hovey |
10/02 |
SFA |
160 SF |
ME Room of East Annex |
07/03 |
SFA,TPA,TJA,TPB,TDC |
168 SF and LTD ABATEMENT |
Telecom Room 5 in East Annex ME Room |
05/06 |
MFA |
First floor hallway of old HOV |
|