ACM |
Quantity |
Location |
|---|---|---|
| TBA – Boiler Insulation | ||
| TPA – Mag Block Pipe Cover | Through out east half, basement and tunnels of plant. | |
| TJA – Mudded Joints on Mag Block Pipe Cover | Through out east half, basement and tunnels of plant. | |
| TPB – Layered Paper Pipe Cover | Through out east half, basement and tunnels of plant. | |
| TJB – Mudded Joints on Layered Paper Pipe Cover | Through out east half, basement and tunnels of plant. | |
| TPC – Air Cell Pipe Cover | Through out east half, basement and tunnels of plant. | |
| TJC – Mudded Joints on F/G Pipe Cover | Through out east half, basement and tunnels of plant. | |
| TPD – Tar Paper Pipe Wrap | ||
| MFA – 12 x 12 Floor tile and mastic (Assumed) | Offices and hallway | |
| MMA – Fire Door Insulation (Assumed) | ||
| MMB – Flexible Duct Connector (Assumed) | ||
| MMC – Flange Gasket (Assumed) | ||
| MTA – Transite Conduit (Assumed) | Basement Rooms | |