Asbestos Containing Material
Heat Plant BLD # 018

 
ACM
Quantity
Location
TBA – Boiler Insulation      
TPA – Mag Block Pipe Cover   Through out east half, basement and tunnels of plant.
TJA – Mudded Joints on Mag Block Pipe Cover   Through out east half, basement and tunnels of plant.
TPB – Layered Paper Pipe Cover   Through out east half, basement and tunnels of plant.
TJB – Mudded Joints on Layered Paper Pipe Cover   Through out east half, basement and tunnels of plant.
TPC – Air Cell Pipe Cover   Through out east half, basement and tunnels of plant.
TJC – Mudded Joints on F/G Pipe Cover   Through out east half, basement and tunnels of plant.
TPD – Tar Paper Pipe Wrap    
MFA – 12 x 12 Floor tile and mastic (Assumed)   Offices and hallway
MMA – Fire Door Insulation (Assumed)    
MMB – Flexible Duct Connector (Assumed)    
MMC – Flange Gasket  (Assumed)    
MTA – Transite Conduit (Assumed)   Basement Rooms