ACM |
Quantity |
Location |
|---|---|---|
| TJA – Mudded Joints on Paper Pipe Cover | ||
| TJB – Mudded Joints on F/G Pipe Cover | ||
| TPA – Layered Paper Pipe Cover | ||
| TTA – Mag Block Tank Cover | ||
| MFA – 9 x 9 Floor Tile and Mastic (Assumed) | ||
| MFB – 12 x 12 Floor Tile and Mastic (Assumed) | ||
| MMA – Carpet Mastic (Assumed) | ||
| A major abatement in January 07, most of the ACM was removed from the building, however, pipe cover still remains in the sub-basement Mechanical Room and tunnel accesses. | ||