ACM |
Quantity |
Location |
|---|---|---|
| SFA – Spray on Fireproofing | Room 2 & 3, None Detected per EMSL Analysis 4/16/97. | |
| TJA – Mudded Joints | ||
| TTA – Circulating Tank Insulation | ||
| TPA – Layered Paper Pipe Insulation | ||
| TPB – Air Cell Pipe Insulation | ||
| TPC – Mag Block Pipe Insulation | ||
| MFA - 9 x 9 Floor tile and mastic | 6,629 SF |
1st Floor Rooms and Spaces: 100,100A, 100B,101, 101A,101B,101C,101D,101E,101G, 102,102B,102C,102G,104A,105,106,106A,106B, 107D, 112, 112A, 112B, 123, 131, 132, 133,134,135, 136. 2nd Floor Rooms and Spaces; 201,202,208,209,210,211,212,213,214. |
| MTA – Transite Ceiling Panels | 10,288 SF |
2nd Floor South Gym Room 205 Ceiling |
| MLA – Paper Backing in Light Fixtures | ||
| T – Ceramic Tile not Sampled | ||
| Z – Terrazo not sampled | ||
| Portions of this building is scheduled for demolition in September of 08, the remainder is to be overhauled in January of 09. ACM will be removed in advance of the demolition and renovation activities and Non-ACM products speced for putback.. | ||