Main ACM Locations

Asbestos Containing Material
Metcalf Lab School BLD # 008

ACM
Quantity
Location
A-1 – Spray on Acoustical Ceiling
62,306 SF
First Floor Rooms: 101,102,102A, 102B,102D, 103,104, 104A, 105, 106, 106A,107, 107A, 108, 109, 110, 110A, 111, 111A, 112, 115, 115A, 116, 117, 118, 118D, 118E, 118F,120,120A, 120C,120D,122,126,126A,132,132A,133, 133A,133B,135,139. Second Floor Rooms: 203,204, 204A, 205, 206, 206A, 207, 208, 209, 210 ,211, 212, 213,213A, 214, 215, 215A, 216, 217, 217A, 218, 219, 219A, 221, 222, 222A, 222B, 223, 223A,224,224A,225, 226, 227, 228, 234, 234A, 234C, 235, 235A, 235C, 238, 239,240,240A,240B,240C, 242, Third Floors Rooms: 324A, 324B.  Stairwells: 151,153,155,251,252 and S. Hallways: 150, 150N,150S,152,156,205,250N  
MUD -1 Mudded Joints on F/G Pipe Cover (Assumed)    
MUD -2 Pipe Insulation (Assumed)    
MUD -3 Air Cell Pipe Cover    
FT-3 – 9 x 9 Gray w/ White/Black Marbling and mastic    
FT-5 – 9 x 9 Black w/ White Marbling and mastic    
FT-6 – 9 x 9 Red w/ Tan and White Marbling and mastic