Main ACM Locations

Asbestos Containing Material
PPS Physical Plant Shop BLD # 022

ACM
Quantity
Location
TPA – Layered Paper Pipe Cover    
TJA – Mudded Joints on Layered Paper    
TJB – Mudded Joints on F/G Pipe Cover    
TTA – Mag Block Tank Insulation    
MFA – 12 x 12 Floor Tile and Mastic (Assumed)    
MMA – Fire Door Insulation (Assumed)    
MMB – Carpet Mastic (Assumed)    
MMC – Flange Gasket (Assumed)    
MTA – Transite Freeze Board (Assumed)    
ABATEMENT HISTORY
DATE
MATERIAL REMOVED
AMOUNT
ROOM OR LOCATION
10/05
Fitting Cover
20 LF
Hot Water and Recirc lines throughout shops
05/06
Fitting and Pipe Cover
8 LF
Water meter valve body and piping