ACM |
Quantity |
Location |
|
|---|---|---|---|
| TPA – Layered Paper Pipe Cover | |||
| TJA – Mudded Joints on Layered Paper | |||
| TJB – Mudded Joints on F/G Pipe Cover | |||
| TTA – Mag Block Tank Insulation | |||
| MFA – 12 x 12 Floor Tile and Mastic (Assumed) | |||
| MMA – Fire Door Insulation (Assumed) | |||
| MMB – Carpet Mastic (Assumed) | |||
| MMC – Flange Gasket (Assumed) | |||
| MTA – Transite Freeze Board (Assumed) | |||
ABATEMENT HISTORY |
|||
DATE |
MATERIAL REMOVED |
AMOUNT |
ROOM OR LOCATION |
| 10/05 | Fitting Cover |
20 LF |
Hot Water and Recirc lines throughout shops |
| 05/06 | Fitting and Pipe Cover |
8 LF |
Water meter valve body and piping |