ACM |
Quantity |
Location |
|
|---|---|---|---|
| SFA - Sprayed on Fireproofing | 90 SF |
Basement ME Room |
|
| TPA - Mag Block Pipe Cover | 1200 LF |
ME Rooms,Pipe Chases, ceilings and penthouse. |
|
| TJA – Mudded joints on Mag Block Pipe Cover | 330 EA |
ME Rooms,Pipe Chases, ceilings and penthouse. |
|
| TJB - Mudded joints on F/G pipe cover | 800 EA |
ME Rooms,Pipe Chases, ceilings and penthouse. |
|
| TTA – Heat Exchanger Insulation | 50 SF |
||
| MFA- 9 x 9 Floor tile and mastic (Assumed) | 71,100 SF |
Through out student rooms and hallways. |
|
| MFB- 12 X 12 Floor Tile and mastic (Assumed) | 80 SF |
Basement Break Room |
|
| MMB – Duct Weatherproofing | |||
| MMC – Carpet Mastic (Assumed) | |||
| MMD – Flange Gasket (Assumed) | |||
| MME – Flue Gasket (Assumed) | |||
| MMF – Elevator Brake Shoe (Assumed) | |||
| MMG – Built-Up Roof and Flashing (Assumed) | |||
| MTA- Transite Panels (Assumed) | Student Room Desk Panels | ||
ABATEMENT HISTORY |
|||
DATE |
MATERIAL REMOVED |
AMOUNT |
ROOM OR LOCATION |