Main ACM Locations

Asbestos Containing Material
Williams Hall and Annex BLD #009

ACM
Quantity
Location
TPA - Air Cell Pipe Cover   ME Rooms, Pipe Chases and above ceilings
TPB - Mag Block Pipe Cover   ME Rooms, Pipe Chases and above ceilings
TPC - Mudded joints on F/G Pipe Cover   ME Rooms, Pipe Chases and above ceilings
TBA - Breeching Insulation   Penthouse ME Room # 404
SPB - Textured Plaster   All four floors and south central section of old bld.
MWB - Transite Panels   Walls and Ceilings of ME room 402 and walls of room 225.
Floor Tile and Mastic   Throughout four floors
 
ABATEMENT HISTORY
DATE
MATERIAL REMOVED
AMOUNT
ROOM OR LOCATION
05/06
Mag Block Pipe and Fitting Cover
230 LF
Basement ME Room 1